Following the general election, an unusually large number of MPs entered parliament for the first time, but the building that they will be working in is in serious need of repair. Alex Meakin outlines how the previous parliament approached the problem of restoring and rebuilding a parliamentary estate that is in increasing need of serious work to make it a safe and effective venue for the UK’s legislators. She concludes that the sheer cost of the project will act as a deterrent to strong action, but that further delay will likely only increase that cost, and could result in the loss of the Palace of Westminster as a working building altogether.
Several months into the post-election parliament, the 335 MPs who were sworn in for the very first time are starting to find their way round their new workplace, navigating a building covering the same area as 16 football pitches, across 65 different levels. Along with their returning colleagues, the 2024 cohort will soon be asked to decide on the future of the Palace of Westminster: a decision which has the potential to shape the culture of the legislature for their successors.
As the newly-elected MPs are discovering, behind the magnificent mock-Gothic exterior of the palace lies a building in disrepair. Windows that cannot be closed, mice running along the long corridors, and leaking pipes and toilets are all evidence of the major refurbishment the palace requires. Far greater evidence is hidden behind the walls and within the basement of the building, where the essential mechanical and electrical services — which provide the necessary power, ventilation, communications, and heating to the building — are now decades past their expected lifespan. Their condition leaves the building at risk of a catastrophic event, such as a fire or flood, which could risk lives as well as the future of the palace.
Continue reading

