The Constitution Unit Blog

Menu

Skip to content
  • Home
  • Coronavirus
  • Brexit
  • Parliament
    • House of Commons
    • House of Lords
    • All
  • Elections and referendums
    • 2019 general election
    • 2017 general election
    • EU referendum
    • 2015 general election
    • All
  • Democratic Engagement and Citizens’ Assemblies
  • Government
    • Cabinet manual
    • Coalition
    • Special advisers
    • All
  • Devolution
    • Scotland
    • Wales
    • Northern Ireland
    • England
    • All
  • Events
  • Other themes
    • Judiciary and human rights
      • All
    • Parties and politicians
    • Constitutions and constitution making
    • Freedom of information
    • Monarchy, church and state
    • International
  • Staff contributors
    • Meg Russell
    • Alan Renwick
    • Robert Hazell
    • Sam Anderson
    • Dave Busfield-Birch
    • Roberta Damiani
    • Lotte Hargrave
    • Lisa James
    • Rebecca McKee
    • Luke Moore
    • Honorary staff
      • Daniel Gover
      • Bob Morris
      • Patrick O’Brien
      • Akash Paun
      • Brian Walker
      • Alan Whysall
      • Ben Worthy
      • Ben Yong
  • Constitution Unit website
  • About the Constitution Unit
  • Copyright

Tag Archives: Parliamentary Buildings (Restoration and Renewal Bill)

Placing the public at the heart of the Restoration and Renewal of the Palace of Westminster

Posted on September 11, 2019 by The Constitution Unit

download.001images.001MFlinders.new.small.jpgProgress on the Restoration and Renewal (R&R) project has been slow, but despite the time taken, there has been limited engagement with the public on the issue. Alexandra Anderson, Alexandra Meakin and Matt Flinders express optimism that amendments to the legislation responsible for R&R indicate a promising change of direction, creating an opportunity not to simply restore and protect the past but to embrace a positive vision of the future.

It is now three years since a Joint Select Committee warned that ‘The Palace of Westminster, a masterpiece of Victorian and medieval architecture and engineering, faces an impending crisis which we cannot responsibly ignore’. This crisis, the Committee continued, was likely to be a catastrophe, such as a major fire or flood, or a succession of failures of the infrastructure, leaving the building unusable. There can now be no doubt about the validity of this warning: since the Committee reported we have seen the House of Commons flood during a debate, a ‘football-sized lump’ fall off the Victoria Tower, and wardens are currently patrolling the building twenty-four hours a day to address the regular outbreaks of fire (now totalling 66 in the last decade). As the then Leader of the Commons, Andrea Leadsom, told MPs in May — referring only to the instances of crumbling masonry — ‘It is only through luck that none of them has led to any serious injuries or even fatalities’. If any further warning was necessary, the tragedy of Notre Dame in April demonstrated the potential devastation of fire.

This week has marked a significant step forward in plans for a major renovation, aimed at keeping the building—and the visitors, parliamentarians, and staff within it—safe from disaster or tragedy. The Parliamentary Buildings (Restoration and Renewal) Act 2019, which has now received Royal Assent, will establish the necessary governance bodies so that the planning work for what will be a multi-billion, multi-decade project can begin in earnest.

Not only will the Act offer the best opportunity for preventing a crisis hitting the Palace, it also offers the opportunity to place the public at the heart of this renovation: the Restoration and Renewal (R&R) Programme. This is hugely significant. The original text of the legislation (and the projects associated with the wider programme) were designed to address only the crisis of the building, and not the broader crisis of UK democracy. Amendments tabled in the House of Lords and approved by the Commons on Monday have ensured that public engagement will be an integral part of fixing the Palace. Continue reading →

Posted in Parliament | Tagged Alex Meakin, Alexandra Anderson, Alexandra Meakin, andrea leadsom, Audit of Political Engagement, Baroness Andrews, Baroness Stowell, Baroness Stowell of Beeston, Crick Centre, decant, Feminising Politics, Hansard Society, House of Commons, House of Commons Commission, House of Lords, Institute for Government, John Bercow, Joni Lovenduski, Leader of the Commons, Lord Bethell, Matt Flinders, Northern Estate Programme, Palace of Westminster, parliament, Parliamentary Buildings (Restoration and Renewal Bill), public engagement, restoration and renewal, Sarah Childs, Sir Bernard Crick Centre for the Public Understanding of Politics, Speaker, Speaker of the House of Commons, The Good Parliament

Monitor 77: Change, continuity, and an uncertain future for the Union

Taking Back Control

Working Group on Unification Referendums on the Island of Ireland

My Tweets

Enter your e-mail address to follow this blog and receive notifications of new posts by e-mail.

Join 2,359 other followers

Unit Mailing List: Sign up to receive notifications of of our events, newsletter and publications

Mailing List

The Unit at 25: celebrating 25 achievements

Parliament and Brexit

Improving discourse during election and referendum campaigns

The Independent Commission on Referendums

Blog at WordPress.com.
Cancel

 
Loading Comments...
Comment
    ×